Busan Port Connection Construction Project Status Report

The project to connect the southern and northern docks of Busan to construct a new port is currently underway. This ambitious project commenced in October 2003 and has been progressing steadily.

Current Status:

  • Drilling Operations: Utilizing 1016% CASNG PPE, the drilling depth has reached between 26 to 35 meters.
  • Methodology: The PRD (Percussion Rotary Drilling) technique has been effectively employed to ensure efficient drilling operations.

This project is expected to significantly enhance the logistics efficiency of Busan Port and positively impact the regional economy. With rigorous management and continuous technical support, we aim for the successful completion of this transformative endeavor.



Copyright Notice

© KUKJE DIAMOND IND CO.,LTD, [2024]. All rights reserved. 

© SUNG Ju M.i IND CO.,LTD, [2024]. All rights reserved.

Unauthorized use or reproduction of this material is strictly prohibited and will result in immediate legal action.

For permissions, contact: KUKJEDIA@KUKJEDIA.COM


저작권 경고문

© 국제 다이이몬드 공업, [2024]. 모든 권리 보유.

© 성주 엠.아이, [2024]. 모든 권리 보유.

이 자료를 무단으로 사용하거나 복제하는 것은 엄격히 금지되며, 즉각적인 법적 조치로 이어질 것입니다.

허가 요청: KUKJEDIA@KUKJEDIA.COM